Skip to content

For administrators

Everything the people running the session need: what to deploy, what to configure, who gets which product, what to print, and the session itself.

Home

The kit

Page Use it to
Deploy Bring up the Test Suite with its IDE and the connectors
Configure Create organizations, users and one connector pair per team
Assign products Decide which team works on which product
Handouts Print one page per team from the catalog, the assignments and your connector list
Run of show Run the session, minute by minute

What a team needs in the room

flowchart LR
    B["Team's browser"] --> IDE["Test Suite with IDE"]
    B -->|"their own key"| LLM["Their LLM provider"]
    IDE --> ENG["Engine"]
    ENG --> PAIR["The team's connector pair<br/>+ registry, wallets, BDRS"]
    B --> GH["GitHub<br/>fork and pull request"]
    GH --> RUN["Runner<br/>its own developer toolbox"]

The model is the team's own. Nothing about it is deployed or paid for by the event.

Pre-event checklist

Two weeks before

  • The tutorial pull request is merged, so that the reusable workflow exists at eclipse-tractusx/tutorial-resources/.github/workflows/e2e-test.yml@main. Until then the workflow call in chapter 7 has nothing to call.
  • The team list is final. See Assign products.
  • The committers of every assigned product know that a pull request is coming, and agree to approve workflow runs of first-time contributors on the day.
  • The invitation tells participants to complete the Prerequisites: ECA, Git, and a model of their own.

One week before

  • The Test Suite is deployed at its final address. See Deploy.
  • Organizations, users and connector pairs exist. See Configure.
  • One person who did not build the setup does the whole tutorial from a handout, on a guest network, with a personal API key. Write down every place they stopped.
  • The ten-minute opening deck exists: the problem, the idea, the mission.

Two days before

  • Fix list from the dry run is done.
  • Handouts are built from the real inventory and printed. See Handouts.
  • Screenshots in the tutorial still match the deployed IDE. Retake the ones that do not.
  • The addresses on the handout are the final ones.

On the day, 30 minutes before

From a laptop on the venue's guest network:

  • The IDE opens and a workshop account can sign in.
  • api.openai.com and api.anthropic.com are reachable from the browser.
  • <hello service>/hello answers in a guest laptop's browser.
  • Compile on the template project is green.
  • Run on the template project passes against one team's connector pair.
  • github.com is reachable, and a git push works.
  • The last run of the worked example's workflow is green.

Open decisions

Decision Default used in this kit
Address of the IDE at ARENA2036 Placeholder https://ide.example.org
Team list Five invented teams in catalog/assignments.json
One connector pair per team, or one shared pair One pair per team
Whether participants get personal accounts One account per team

NOTICE

This work is licensed under the CC-BY-4.0.

About this tutorial

Version
v1.0
Added
Nov 2026
Updated
Nov 2026

Authors

Versions

  1. 1.0 Nov 2026 First published, for the Tractus-X Community Days 2026.