Skip to content

Getting Started · chapter 6 of 9 · ● ● ● ● ● ● ○ ○ ○

6 · Run it against your connectors

Goal: a green run, and one red run that you caused on purpose. Time: 10 minutes

Steps

  1. Press Run at the top. The dialog Run to debug opens with five steps.

    Step You do
    Build Nothing. It ends with "Compiled — ready to run." Press Next.
    Infrastructure Choose your product under App under test and your connector under EDC Connector. If your test uses a registry, choose it under Digital Twin Registry. Press Next.
    Variables Click each value in the list. Fill in what is empty from box C of your handout: product_internal_url is "Product, as the connector reaches it", dtr_internal_url is "Registry, as the connector reaches it". Where the dialog offers a list, choose from it. Press Next.
    SUT Setup Press Start review, then Accept all and Confirm all. Your test creates these offers itself, in its setup. Press Next.
    Summary & Launch Check the list of tests. Press Run at the bottom right.

    You type nothing from box D. The partner side is set up by the administrators.

  2. Watch the Console at the bottom. Each step turns green or red as it finishes.

  3. Wait for the result.
  4. Now break it on purpose. Open your negative test, change the expected value of one check, for example 0 to 1 or 404 to 200, and run again.
  5. See it turn red at that check. Change it back and run once more.

A test that has never failed has proven nothing yet. Step 4 is the difference between a test and a script that prints green.

You should now see

The last step of the dialog, with your tests and your connector listed, and after the run the status Passed.

The Summary & Launch step of the Run to debug dialog

The second step, Infrastructure, looks like this when your components are registered:

The Infrastructure step of the Run to debug dialog, with a connector selected

Note

Nothing to choose under Infrastructure? Register it yourself, with the values of box C: Register an app (name and version of your product), Register a connector (name, DSP URL, Participant ID and DID) and Register a registry (name and base URL).

Tip

Stuck?

  • The run fails at once with "requires infrastructure that is not fully bound: engine.connector": the partner side is not set up for your team. Go to the Desk.
  • The run waits: give it a minute, then ask at the Desk whether your connectors are up.
  • A value is refused as "not a public host name": use the address from box C exactly as printed.
  • A step is red: open it and read the request and the answer. Decide which it is:
    • The environment. Nothing answered, or a value is wrong. Fix the value or ask.
    • A finding. The product answered, and not as your check expects. Either your reading of the promise is wrong, or the product is. Both are worth knowing.
  • Minute 40 and no green run: go on to chapter 7. The workflow runs your test again in CI, in a dataspace of its own.

NOTICE

This work is licensed under the CC-BY-4.0.

About this tutorial

Version
v1.0
Added
Nov 2026
Updated
Nov 2026

Authors

Versions

  1. 1.0 Nov 2026 First published, for the Tractus-X Community Days 2026.