Context
A running job can be paused (JobManager.pause) and resumed. Until now a pause
was a gate: the phase runner waited on an asyncio.Event before each setup and
execution step. The step in flight was not touched, and nothing the run had
published to the outside was withdrawn.
That was enough for a run that only calls out. It is not enough for one the
system under test (SUT) calls back into, which is most of the TCKs that
matter. In a push test such as CX-0135's
validate_certificate_push.yaml, the run:
- registers a mock (
mock/api) and offers it on the engine connector (connector/provider/create_mock_asset, a policy,connector/provider/create_contract_definition); - blocks on
mock/wait/dataplane/http_request, with a timeout, until the SUT negotiates that offer and calls the mock through its data plane.
Paused during step 2, the run showed "PAUSED", but the offer stayed in the catalog and the mock kept answering. The SUT could negotiate and call as if nothing had happened. The wait kept counting its timeout on the server, so the timeout could expire while the run was paused, and the step failed as soon as the run was resumed. The operator saw a paused run with a clock still running, and that clock was right: the backend really was still waiting. What an operator means by pause is that the run stops, and that the SUT cannot use it until they press play.
Decision
A paused run is held. Once it stops, it behaves toward the SUT like a run that is not going: its offers are withdrawn and its mocks do not answer. On resume it puts back what it withdrew, and a wait carries on for the time it had left.
What is withdrawn
- Contract definitions the run created. They are withdrawn, and nothing else on the connector is. A contract definition is what makes an asset appear in the catalog. Without it the SUT finds nothing to negotiate. The assets and policies stay, so putting the offer back is one create call, not a re-provisioning, and nothing breaks for agreements that already reference the asset.
- The run's mocks. They answer 404, and the call neither resolves a wait nor fails one. This covers what withdrawing the offer does not: an agreement negotiated before the pause still carries an EDR, and the data plane would still forward a call on it.
A contract definition that already existed (the create answered 409) is not
the run's to withdraw, and is left alone. One the run deleted itself
(connector/provider/delete_contract_definition) is forgotten, and not put
back.
How it works
player/execution/hold.py holds one RunHold per run, on the StepContext,
bound to the job by the player before the first step.
connector/provider/create_contract_definitionrecords every definition it creates on the hold: its id, a call that deletes it, and a call that posts the same model again.delete_contract_definitiondrops it from the record.JobManager.pausecloses the gate as before and also sets a pause request (get_pause_request). That is an event a step can wait on, so a pause can reach a step that is blocked.- The gate between steps is
RunHold.gate→pause_point. If the run is paused, it: - marks the job held (
JobManager.hold/is_held); - deletes the recorded definitions, last created first, and publishes
job_heldwith what it withdrew and what the connector refused to delete; - waits for the gate to open;
- posts the withdrawn definitions again, in creation order, clears the hold
and publishes
job_restored. mock/wait/*races the callback against the pause request (steps/mock/_paused_wait.py). If the pause comes first, the listener is cancelled (which closes it), andstep_suspendedreports the remaining timeout. The step then goes to the samepause_point. After the hold, it registers the listener again, publishes a freshstep_waitingwithtimeout_sset to the remaining time, and waits again. A call that arrives at the same instant as the pause wins.elapsed_mscounts only the time spent waiting.- Mocks: testlab's server answers 404 on every mock route while any run of its
player is held (
routes.callbacks.on_hold). Its mocks are not kept per run, so there is nothing finer to hold. A host that serves each run's mocks under its own address (the Catena-X engine's/mock/<job_id>/…) checksJobManager.is_held(job_id)and answers 404 for that run alone.
Ordering and cancellation
job_paused
[step_suspended] a wait was blocked when the pause came
job_held definitions deleted, mocks turned away
job_resumed
job_restored definitions posted again, mocks answer
[step_waiting] timeout_s = what was left
A paused run that is cancelled opens its gate without being resumed. The hold still puts the definitions back before the run stops. The teardown then finds and deletes what the run created, just as it would for a run that was never paused, and the teardown's delete assertions stay true. The pause request the cancellation leaves behind is cleared, so it cannot stop the next wait.
Teardown never pauses, as before.
Consequences
- A pause takes effect as soon as the step in flight ends, and immediately for a step blocked on the SUT. Only waits for a callback are interrupted. A call out to the SUT (a negotiation, a catalog query) runs to its end first, because stopping it half way would leave the SUT in a state the run cannot describe.
- While held, the SUT sees an empty catalog and a mock that answers 404. That is what it sees for a cancelled run, which is the point: nothing it does while the run is paused can count toward the run.
- Posting a definition again gives it the same id and the same model. A
connector that refuses (the definition was re-created by someone else in the
meantime, or the connector is unreachable) is reported in
job_restored.lost, and the run goes on. The SUT will then not find the offer, and the wait times out saying so. - Negotiations already under way at the pause are not undone. An agreement the SUT concluded before the pause is still valid after it, so a wait that resumes can be satisfied without a new negotiation.
- The hold changes nothing for a context built outside the player: an unbound
RunHoldrecords but never holds, and the gate falls back to waiting on theJobManagerevent.
Alternatives considered
- Keep the gate, and show the clock as running. It is honest about what the backend does, but it is not what an operator means by pause. The operator wants the run frozen.
- Tear down the whole provisioning (assets, policies, definitions) and re-run it on resume. Deleting an asset that an agreement references is refused by the EDC. Re-creating a mock asset would also need the run's key again. That is more calls and more failure modes, for no difference the SUT can observe: without a definition there is no offer.
- Re-run the setup phase on resume. Setup steps are not idempotent (fresh UUIDs, one-shot registrations), and they publish outputs that later steps have already read.
- Pause the timeout but leave the offer and the mocks up. The SUT could then call while the run is paused, and the call would be buffered and counted once the run resumed. That is a result produced during a pause.